Ir directamente a la información del producto
1 de 11

Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT

Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT

Precio habitual $97.70 CAD
Precio habitual Precio de oferta $97.70 CAD
Oferta Agotado
Los gastos de envío se calculan en la pantalla de pago.
Style
Size
configuration

SKU:B0CYN62WTK

Bajas existencias: quedan 4

Cantidad

Proven to maximize engine life, Valvoline Advanced Protection Full Synthetic 0W-20 Motor Oil delivers outstanding performance and durability you can count on. Formulated with high-quality synthetic base oils, it provides 40% stronger wear protection, 15% better deposit defense, and up to 2.5X better heat protection than industry standards. Advanced additive boosters minimize the effects of excessive heat and defend against damaging sludge to improve engine cleanliness. Its full synthetic formula flows easily during low temperatures to reduce wear at cold starts — when most engine damage occurs — and enhances fuel economy for more efficient performance. Valvoline Advanced Protection full synthetic formula not only improves fuel economy but also safeguards against the four major causes of engine breakdown: wear, friction, heat and deposits. Suitable for hybrid cars as well as most Toyota, Honda, Nissan Chevy, Ford, Dodge and more. For confidence and protection you can trust in all kinds of driving conditions, switch to Advanced Protection Full Synthetic motor oil. From Valvoline, the Original Motor Oil brand.

Product Overview

  • SAE J300 Viscosity Grade: 0W-20
  • Brand: Valvoline
  • Liquid Volume: 4.7 Liters
  • Package Information: Bottle
  • Vehicle Service Type: Car, Truck

Product Features

  • Advanced protection against the four main causes of engine breakdown: wear friction heat and deposits
  • Delivers 40% stronger wear protection than industry standards to reduce friction and improve fuel economy
  • Provides 15% better deposit defense vs. industry standards, keeping engines cleaner for smoother performance and longer-lasting protection
  • Up to 2.5X better heat protection vs. industry standards to fight harmful sludge formation and thermal breakdown
  • Engineered for excellent low-temperature flow, reducing metal-to-metal contact during cold starts — when most engine wear typically occurs
  • Meets the requirements of: ILSAC GF-7A, API SQ, API SP, API SN with SN PLUS, Resource Conserving and all preceding API and ILSAC gasoline categories. Additional Specifications: Ford WSS-M2C962-A1, Chrysler MS-13340, GM dexos 1 Gen 3

Product Information

    Container Type Bottle
    Compatible with Vehicle Type Car, Truck
    Flash Point 200 Degrees Celsius
    Viscosity Level Low to Medium
    Automotive Fit Type Vehicle Specific Fit
    SAE J300 Viscosity Grade 0W-20
    Liquid Volume 4.7 Liters
    Brand Name Valvoline
    Manufacturer Part Number 881150
    UPC 074130031777
    Global Trade Identification Number 00074130031777
    Manufacturer Valvoline
    Size 5 QT
    Model Number 881150-EA
    Item Type Name Motor Oil
    Included Components Motor Oil
    Unit Count 1.0 Count
    Best Sellers Rank
    ASIN B00GZKC6EW
    Customer Reviews

Características del producto

Materiales y cuidado

Consejos de comercialización

  • Encabezado
  • Encabezado
  • Encabezado
Ver todos los detalles
Tu carrito
Variante Total de variantes Cantidad Precio Total de variantes
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Extended Protection / 5 QT (Pack of 2) / 0W-20B0CYN62WTK
Extended Protection / 5 QT (Pack of 2) / 0W-20B0CYN62WTK
$97.70/unidad
$0.00
$97.70/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Extended Protection / 5 QT (Pack of 2) / 5W-20B0CYN5LGT3
Extended Protection / 5 QT (Pack of 2) / 5W-20B0CYN5LGT3
$97.70/unidad
$0.00
$97.70/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Extended Protection / 1 QT, Pack of 6 / 5W-30B08YRXYZK3
Extended Protection / 1 QT, Pack of 6 / 5W-30B08YRXYZK3
$110.43/unidad
$0.00
$110.43/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
5W-30 / 1 QT, Case of 6 (Pack of 2) / 5W-30B0CYN6KMNQ
5W-30 / 1 QT, Case of 6 (Pack of 2) / 5W-30B0CYN6KMNQ
$160.76/unidad
$0.00
$160.76/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
European Vehicle / 5 QT, Pack of 3 / 5W-30B07ZCRH2VY
European Vehicle / 5 QT, Pack of 3 / 5W-30B07ZCRH2VY
$0.00/unidad
$0.00
$0.00/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Restore & Protect / 1 QT / 0W-20B0CQ32LYVB
Restore & Protect / 1 QT / 0W-20B0CQ32LYVB
$18.16/unidad
$0.00
$18.16/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Advanced Protection / 1 QT / 0W-20B002ZSI9O4
Advanced Protection / 1 QT / 0W-20B002ZSI9O4
$13.44/unidad
$0.00
$13.44/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
European Vehicle / 1 QT / 0W-20B07ZCR3PP4
European Vehicle / 1 QT / 0W-20B07ZCR3PP4
$20.55/unidad
$0.00
$20.55/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
European Vehicle / 1 QT, Pack of 6 / 0W-30B08ZL5PN3L
European Vehicle / 1 QT, Pack of 6 / 0W-30B08ZL5PN3L
$100.81/unidad
$0.00
$100.81/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Extended Protection / 5 QT, Pack of 3 / 0W-20B08YRXJYLX
Extended Protection / 5 QT, Pack of 3 / 0W-20B08YRXJYLX
$174.60/unidad
$0.00
$174.60/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
European Vehicle / 1 QT (Pack of 2) / 0W-30B0CXPY1NH1
European Vehicle / 1 QT (Pack of 2) / 0W-30B0CXPY1NH1
$53.82/unidad
$0.00
$53.82/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Extended Protection / 1 QT (Pack of 2) / 5W-20B0CDQJWVFC
Extended Protection / 1 QT (Pack of 2) / 5W-20B0CDQJWVFC
$30.25/unidad
$0.00
$30.25/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
10W-30 / 1 QT, Case of 6 (Pack of 2) / 10W-30B0CYMBHGCX
10W-30 / 1 QT, Case of 6 (Pack of 2) / 10W-30B0CYMBHGCX
$109.13/unidad
$0.00
$109.13/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
European Vehicle / 5 QT, Pack of 3 / 0W-40B07ZCR1LMZ
European Vehicle / 5 QT, Pack of 3 / 0W-40B07ZCR1LMZ
$172.95/unidad
$0.00
$172.95/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Advanced Protection / 5 QT, Pack of 3 / 0W-16B07ZCQXGXP
Advanced Protection / 5 QT, Pack of 3 / 0W-16B07ZCQXGXP
$209.10/unidad
$0.00
$209.10/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
European Vehicle / 1 QT, Pack of 6 / 0W-40B06X9T1P19
European Vehicle / 1 QT, Pack of 6 / 0W-40B06X9T1P19
$100.81/unidad
$0.00
$100.81/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
European Vehicle / 5 QT, Pack of 3 / 5W-40B07ZCR1LNG
European Vehicle / 5 QT, Pack of 3 / 5W-40B07ZCR1LNG
$136.38/unidad
$0.00
$136.38/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Extended Protection / 1 QT / 0W-20B08YS13246
Extended Protection / 1 QT / 0W-20B08YS13246
$15.12/unidad
$0.00
$15.12/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Advanced Protection / 1 QT, Pack of 6 / 10W-30B00062YCF6
Advanced Protection / 1 QT, Pack of 6 / 10W-30B00062YCF6
$0.00/unidad
$0.00
$0.00/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Advanced Protection / 5 QT, Pack of 3 / 10W-30B07NLXS67R
Advanced Protection / 5 QT, Pack of 3 / 10W-30B07NLXS67R
$0.00/unidad
$0.00
$0.00/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Restore & Protect / 1 QT / 0W-16B0GM26FS4J
Restore & Protect / 1 QT / 0W-16B0GM26FS4J
$18.16/unidad
$0.00
$18.16/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Advanced Protection / 5 QT, Pack of 3 / 0W-20B07NLWXZDH
Advanced Protection / 5 QT, Pack of 3 / 0W-20B07NLWXZDH
$136.43/unidad
$0.00
$136.43/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
European Vehicle / 5 QT / 5W-40B07ZCQWMWS
European Vehicle / 5 QT / 5W-40B07ZCQWMWS
$62.39/unidad
$0.00
$62.39/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Extended Protection / 5 QT, Pack of 3 / 5W-20B08YRY78XG
Extended Protection / 5 QT, Pack of 3 / 5W-20B08YRY78XG
$162.75/unidad
$0.00
$162.75/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Advanced Protection / 5 QT (Pack of 2) / 10W-30B0CYMWSDFZ
Advanced Protection / 5 QT (Pack of 2) / 10W-30B0CYMWSDFZ
$90.95/unidad
$0.00
$90.95/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Extended Protection / 5 QT (Pack of 2) / 5W-30B0CYNBT7M3
Extended Protection / 5 QT (Pack of 2) / 5W-30B0CYNBT7M3
$92.81/unidad
$0.00
$92.81/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
European Vehicle / 1 QT / 5W-30B01H442A5M
European Vehicle / 1 QT / 5W-30B01H442A5M
$24.65/unidad
$0.00
$24.65/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Extended Protection / 5 QT / 5W-20B08YRZRCGY
Extended Protection / 5 QT / 5W-20B08YRZRCGY
$48.85/unidad
$0.00
$48.85/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
European Vehicle / 1 QT / 5W-40B007IBSDJY
European Vehicle / 1 QT / 5W-40B007IBSDJY
$13.44/unidad
$0.00
$13.44/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Restore & Protect / 1 QT / 5W-20B0CQ33KCWC
Restore & Protect / 1 QT / 5W-20B0CQ33KCWC
$18.16/unidad
$0.00
$18.16/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Advanced Protection / 1 QT, Pack of 6 / 5W-20B000GAD05G
Advanced Protection / 1 QT, Pack of 6 / 5W-20B000GAD05G
$83.46/unidad
$0.00
$83.46/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Advanced Protection / 1 QT (Pack of 2) / 20W-50B0CDQKCBH5
Advanced Protection / 1 QT (Pack of 2) / 20W-50B0CDQKCBH5
$54.80/unidad
$0.00
$54.80/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Restore & Protect / 5 QT / 5W-20B0CQ331G5B
Restore & Protect / 5 QT / 5W-20B0CQ331G5B
$50.53/unidad
$0.00
$50.53/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Restore & Protect / 1 QT / 5W-30B0CQ32RNZ4
Restore & Protect / 1 QT / 5W-30B0CQ32RNZ4
$18.16/unidad
$0.00
$18.16/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Advanced Protection / 1 QT, Pack of 6 / 0W-16B07ZCQPBX5
Advanced Protection / 1 QT, Pack of 6 / 0W-16B07ZCQPBX5
$79.03/unidad
$0.00
$79.03/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
European Vehicle / 5 QT / 5W-30B07TNKH2DY
European Vehicle / 5 QT / 5W-30B07TNKH2DY
$65.74/unidad
$0.00
$65.74/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Restore & Protect / 5 QT / 5W-30B0CQ33FCVN
Restore & Protect / 5 QT / 5W-30B0CQ33FCVN
$50.53/unidad
$0.00
$50.53/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
European Vehicle / 1 QT, Pack of 6 / 5W-40B000GAP428
European Vehicle / 1 QT, Pack of 6 / 5W-40B000GAP428
$90.97/unidad
$0.00
$90.97/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Advanced Protection / 5 QT (Pack of 2) / 5W-20B0CYNCZDLT
Advanced Protection / 5 QT (Pack of 2) / 5W-20B0CYNCZDLT
$90.95/unidad
$0.00
$90.95/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Restore & Protect / 5 QT, Pack of 3 / 0W-20B0CQ32JYW9
Restore & Protect / 5 QT, Pack of 3 / 0W-20B0CQ32JYW9
$151.60/unidad
$0.00
$151.60/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Advanced Protection / 1 QT (Pack of 2) / 0W-20B0CDQHPGTK
Advanced Protection / 1 QT (Pack of 2) / 0W-20B0CDQHPGTK
$26.88/unidad
$0.00
$26.88/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Advanced Protection / 1 QT, Pack of 6 / 0W-8B0G3RT5F71
Advanced Protection / 1 QT, Pack of 6 / 0W-8B0G3RT5F71
$80.83/unidad
$0.00
$80.83/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Advanced Protection / 5 QT, Pack of 3 / 5W-30B07NLZ2VGK
Advanced Protection / 5 QT, Pack of 3 / 5W-30B07NLZ2VGK
$136.43/unidad
$0.00
$136.43/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Restore & Protect / 5 QT, Pack of 3 / 5W-30B0CQ347YVN
Restore & Protect / 5 QT, Pack of 3 / 5W-30B0CQ347YVN
$192.20/unidad
$0.00
$192.20/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Advanced Protection / 5 QT, Pack of 3 / 5W-20B07NLXZL8R
Advanced Protection / 5 QT, Pack of 3 / 5W-20B07NLXZL8R
$172.95/unidad
$0.00
$172.95/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
European Vehicle / 1 QT (Pack of 2) / 5W-40B0CDQL6HWV
European Vehicle / 1 QT (Pack of 2) / 5W-40B0CDQL6HWV
$26.88/unidad
$0.00
$26.88/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
European Vehicle / 1 QT, Pack of 6 / 0W-20B07ZCQJMSS
European Vehicle / 1 QT, Pack of 6 / 0W-20B07ZCQJMSS
$100.81/unidad
$0.00
$100.81/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Restore & Protect / 1 QT, Pack of 6 / 0W-20B0CQ32F5K4
Restore & Protect / 1 QT, Pack of 6 / 0W-20B0CQ32F5K4
$120.46/unidad
$0.00
$120.46/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
Advanced Protection / 55 GA / 5W-30B07Y5477MR
Advanced Protection / 55 GA / 5W-30B07Y5477MR
$2,360.61/unidad
$0.00
$2,360.61/unidad $0.00
Valvoline Advanced Full Synthetic SAE 0W-20 Motor Oil 5 QT
European Vehicle / 1 QT / 0W-30B091XFG297
European Vehicle / 1 QT / 0W-30B091XFG297
$26.91/unidad
$0.00
$26.91/unidad $0.00

Ver carrito
0

Total de artículos

$0.00

Subtotal de productos

Impuestos, descuentos y envío calculados en la pantalla de pago.
Ver carrito

Contenido plegable

Fila plegable

Fila plegable

Fila plegable

Fila plegable